Rs 5,000 Crore Bridge between Dhubri to South bank to be Completed by 2027

Rs 5,000 Crore Bridge between Dhubri to South bank to be Completed by 2027

North BankNorth Bank
India TodayNE
  • Jul 23, 2019,
  • Updated Jul 23, 2019, 1:43 AM IST

New Delhi, July 22, 2019:

The work of construction of four-lane bridge including approaches over river Brahmaputra between Dhubri on North Bank in Assam and Phulbari on South Bank in Meghalaya is being taken up with loan assistance from Japan International Cooperation Agency (JICA).

The estimated cost of this work is Rs. 4,997.04 crore. The construction period is 7 years and 9 months and the projected date of completion is in the year 2026-27.

Also Read : Assam: Japanese Encephalitis Death Toll Rises To 110

The work falls under the project ‘North East Road Network Connectivity Improvement Project’. National Highways and Infrastructure Development Corporation Limited (NHIDCL), a Central Public Sector Enterprise (CPSE) under the Ministry of Road Transport and Highways, is the executing agency.

This was stated by the Union Minister for Road Transport and Highways Shri Nitin Gadkari, as a reply in Rajya Sabha today.

It is to be mentioned that among the development of connectivity in the state, Bogibeel was one of the latest development.

INSIDE NORTHEAST’S CAMPAIGN #LETSSAVEDEEPORBEEL IS NOW SUPPORTED BY OIL INDIA LIMITED (OIL). JOIN US AS WE CONTINUE THE AWARENESS CAMPAIGN TO PRESERVE THE ONLY RAMSAR SITE IN ASSAM WHICH IS FACING IMMENSE THREATS. WE NEED YOUR HELP TO PRESERVE THIS SITE OF GREAT ECOLOGICAL IMPORTANCE. JOIN THE #LETSSAVEDEEPORBEEL CAMPAIGN AND TWEET ABOUT IT, AND DO TAG US ON TWITTER. LET’S MAKE SOME NOISE!

KEEP FOLLOWING INSIDE NORTHEAST ON FACEBOOK, YOUTUBE, TWITTER, AND INSTAGRAM. DOWNLOAD THE INSIDE NORTHEAST APP FROM HERE HTTPS://PLAY.GOOGLE.COM/STORE/APPS/DETAILS?ID=COM.INSIDENORTHEAST.APP&HL=EN FOR NEWS, VIEWS AND REVIEWS FROM NORTHEAST INDIA. DO KEEP FOLLOWING US FOR NEWS ON-THE-GO. WE DELIVER THE NORTHEAST.
Read more!